News

On June 15, 2007, BCM Resources Corporation (TSX-V: B) announced results of 0.189 % Mo. over 17.34 meters. Actual high grade results are 0.152% over 17.34 meters.

This discrepancy was due to a sample interval error discovered during a final review of a due diligence database compiled at the request of third parties interested in the Shan Molybdenum Property.

This interval was from Hole 27 which terminated in high-grade mineralization in what appears to be a pre-mineralized fault zone. The company is currently drilling two new holes at depth to determine the true extent of the zone and whether it is a mineralized fault zone or rubble from a mineralized zone cut off by a post-mineral fault.

Qualified Person
Daryl Hanson, P.Eng., a Qualified Person as defined in NI 43-01, has reviewed the technical content of the drill program.

Contact:
Dale McClanaghan
President & CEO
604.646.0144
www.bcmresources.com

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.